How much capacity is your environment holding back?

Enter the people in scope and move the activation slider. The result uses the method's own calculation: people × (1 − activation).

Activation (A)0.68Avg. loaded cost$100k per personHeadcount1,000 people×(1 − A)0.32Unrealized FTE320 FTE×Unrealized $$32M a year
  1. Headcount in scope: 1,000 people
  2. Times (1 − A), with activation A = 0.68: 0.32
  3. Unrealized FTE: 320
  4. Times the average loaded cost: $100k per person
  5. Unrealized cost: $32M a year

Your unrealized capacity

Your real A comes from the diagnostic. Move it to see how much activation is worth.

Unrealized Human Equity
320 FTE
1,000 × (1 − 0.68)
In labor cost
—
Add a labor cost to see this line
68% activated32% held backEach figure ≈ 10 people

How to read this

  • It is the capacity you already pay for that the environment does not let people use. It is not a headcount reduction.
  • The calculation is the method's own: people in scope × (1 − A). It needs no financial data; cost is optional.
  • This is an estimate from an activation value you choose. The diagnostic measures your actual A from your leaders' ratings.

Find out your actual activation.

Next

How we engage

From a free five-minute preview to a re-score.

Continue